Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 

All Case Studies

1-10 of 29 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/MOL-Hungary-Case-Study.pdf
Document Type: Case Study |  Date Authored: 12 Feb 2020 |  Size: 2MB
At Hungary’s only crude oil refinery, a well-planned approach to control system and safety system migration extended the life of technology investments, expanded automation capabilities, and replaced legacy assets with a reliable and supportable system.Read the case study to know more.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-ShellArgentina-IMAC.pdf
Document Type: Case Study |  Date Authored: 14 Sep 2017 |  Size: 1MB
With Honeywell’s integrated technology, Shell has optimized its shale production in the Neuquén region of western Argentina. The Sierras Blancas/Cruz de Lorena EPF project was successfully completed on time and on budget.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-CNOOC-IntegratedSafety.pdf
Document Type: Case Study |  Date Authored: 17 Aug 2017 |  Size: 1MB
Honeywell supplied the Experion® PKS Distributed Control System, Safety Manager Emergency Shutdown system, Safety Manager Fire and Gas system, and combustible and toxic gas detectors and flame detectors for the Shenzhen LNG project.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-CNOOC-IntegratedSafety-CN.pdf
Document Type: Case Study |  Date Authored: 17 Aug 2017 |  Size: 1MB
Chinese version. Honeywell supplied the Experion® PKS Distributed Control System, Safety Manager Emergency Shutdown system, Safety Manager Fire and Gas system, and combustible and toxic gas detectors and flame detectors for the Shenzhen LNG project.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-Shell-AccessFire.pdf
Document Type: Case Study |  Date Authored: 28 Jun 2017 |  Size: 1MB
With Digital Video Manager and a complete fire and gas system at its new Sierras Blancas facility in Argentina, Shell has incorporated video into process control and safety for an increased situational awareness and better safety and security.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-PCS-Singapore-FireGas.pdf
Document Type: Case Study |  Date Authored: 29 May 2017 |  Size: 1MB
Petrochemical Corporation of Singapore Invests in Plant and Personnel Safety with Installation of State-of-the-Art Fire and Gas System
www.honeywellprocess.com/library/marketing/case-studies/CNOOC_Case_Study_EN.pdf
Document Type: Case Study |  Date Authored: 14 Apr 2017 |  Size: 245KB
A Phased Approach: Upgrading to Orion for Improved Operations
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-ToromochoCopper-FireGas_2017.pdf
Document Type: Case Study |  Date Authored: 14 Apr 2017 |  Size: 1MB
Integrated fire protection at Toromocho Minera Chinalco
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-KOGAS-SafetyManager.pdf
Document Type: Case Study |  Date Authored: 12 Apr 2017 |  Size: 1MB
Honeywell completed an FSC to Safety Manager Controller migration program at the KOGAS Tongyeong LNG re-gasification plant in Korea. Minimizing downtime, Honeywell delivered a solution that extends the life of the safety system while enhancing reliability and efficiency.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-ONGC-FireGas.pdf
Document Type: Case Study |  Date Authored: 22 Mar 2017 |  Size: 1MB
ONGC Integrates F&G Safety System with Plant-Wide Network to Upgrade Safety and Improve Operating Efficiencies.
1-10 of 29 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.