Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 

All Case Studies

1-7 of 7 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-ShellArgentina-IMAC.pdf
Document Type: Case Study |  Date Authored: 14 Sep 2017 |  Size: 1MB
With Honeywell’s integrated technology, Shell has optimized its shale production in the Neuquén region of western Argentina. The Sierras Blancas/Cruz de Lorena EPF project was successfully completed on time and on budget.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-KOGAS-SafetyManager.pdf
Document Type: Case Study |  Date Authored: 12 Apr 2017 |  Size: 1MB
Honeywell completed an FSC to Safety Manager Controller migration program at the KOGAS Tongyeong LNG re-gasification plant in Korea. Minimizing downtime, Honeywell delivered a solution that extends the life of the safety system while enhancing reliability and efficiency.
www.honeywellprocess.com/library/marketing/case-studies/Marsori-Liquefied-Gas-Terminal-Industrial-Security.pdf
Document Type: Case Study |  Date Authored: 7 Feb 2014 |  Size: 133KB
Marsori Liquefied Gas Terminal Sets Industry Benchmark with Honeywell Technology
www.honeywellprocess.com/library/marketing/case-studies/CS-LUKOIL-CentralControlSystem-Russian.pdf
Document Type: Case Study |  Date Authored: 11 Dec 2013 |  Size: 129KB
Honeywell installs Centralized Control System at LUKOIL Volgogradneftepererabotka. Ltd
www.honeywellprocess.com/library/marketing/case-studies/CS-YPFB-Chaco-SA-ProcessLogix-Migration.pdf
Document Type: Case Study |  Date Authored: 8 Nov 2013 |  Size: 85KB
YPFB Chaco SA Migrates to Experion PKS® from Rockwell’s ProcessLogix Without Downtime
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-DolphinEnergy-UpgradetoExperionR400.pdf
Document Type: Case Study |  Date Authored: 3 Sep 2013 |  Size: 414KB
The process control system at Dolphin Energy included five separate areas to be addressed. Obsolescence was a key driving influence, with obsolete server and station hardware platforms, out of support Windows operating system software, and Experion R210 that required upgrading.
www.honeywellprocess.com/library/marketing/case-studies/CS-PDOYibal-DCSUpgrade.pdf
Document Type: Case Study |  Date Authored: 10 Apr 2013 |  Size: 191KB
Despite an incredibly tight time frame, Honeywell was able to migrate the existing TPS-FF solution to its C300 controller to give the plant best-in-class process control and support for a wide variety of process control situations.
1-7 of 7 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.