Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 

All Case Studies

1-2 of 2 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-DolphinEnergy-UpgradetoExperionR400.pdf
Document Type: Case Study |  Date Authored: 3 Sep 2013 |  Size: 414KB
The process control system at Dolphin Energy included five separate areas to be addressed. Obsolescence was a key driving influence, with obsolete server and station hardware platforms, out of support Windows operating system software, and Experion R210 that required upgrading.
www.honeywellprocess.com/library/marketing/case-studies/CS-PDOYibal-DCSUpgrade.pdf
Document Type: Case Study |  Date Authored: 10 Apr 2013 |  Size: 191KB
Despite an incredibly tight time frame, Honeywell was able to migrate the existing TPS-FF solution to its C300 controller to give the plant best-in-class process control and support for a wide variety of process control situations.
1-2 of 2 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.