Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 
Search Result Filters
Industry Solution
 
Product
 
Service
 
Date Authored
 

All Case Studies

1-10 of 60 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/Case-Study-DuPont-EIM.pdf
Document Type: Case Study |  Date Authored: 24 Jan 2019 |  Size: 1MB
DuPont case study for Spruance Works facility, use of Experion PKS and EIM.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-Triton-TerminalSolutions.pdf
Document Type: Case Study |  Date Authored: 14 Jun 2018 |  Size: 1MB
Integrated Terminal Management Solution Meets Critical Inventory Control and Safety Requirements
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-UnilubeExpansion-MigrationUPC.pdf
Document Type: Case Study |  Date Authored: 24 May 2018 |  Size: 302KB
With the Honeywell Universal Process Cabinet (UPC), United Lube Oil Company successfully commissioned a new lube oil plant in a short period within a tight turnaround schedule with reduced CAPEX.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-TaiyoOil-DCSMigration.pdf
Document Type: Case Study |  Date Authored: 4 Oct 2017 |  Size: 1MB
Taiyo and Honeywell collaborated well to complete the DCS migration with no major issues and on schedule, with just a day of shutdown.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-ShellArgentina-IMAC.pdf
Document Type: Case Study |  Date Authored: 14 Sep 2017 |  Size: 1MB
With Honeywell’s integrated technology, Shell has optimized its shale production in the Neuquén region of western Argentina. The Sierras Blancas/Cruz de Lorena EPF project was successfully completed on time and on budget.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-CNOOC-IntegratedSafety.pdf
Document Type: Case Study |  Date Authored: 17 Aug 2017 |  Size: 1MB
Honeywell supplied the Experion® PKS Distributed Control System, Safety Manager Emergency Shutdown system, Safety Manager Fire and Gas system, and combustible and toxic gas detectors and flame detectors for the Shenzhen LNG project.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-CNOOC-IntegratedSafety-CN.pdf
Document Type: Case Study |  Date Authored: 17 Aug 2017 |  Size: 1MB
Chinese version. Honeywell supplied the Experion® PKS Distributed Control System, Safety Manager Emergency Shutdown system, Safety Manager Fire and Gas system, and combustible and toxic gas detectors and flame detectors for the Shenzhen LNG project.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-KOGAS-SafetyManager.pdf
Document Type: Case Study |  Date Authored: 12 Apr 2017 |  Size: 1MB
Honeywell completed an FSC to Safety Manager Controller migration program at the KOGAS Tongyeong LNG re-gasification plant in Korea. Minimizing downtime, Honeywell delivered a solution that extends the life of the safety system while enhancing reliability and efficiency.
www.honeywellprocess.com/library/marketing/case-studies/CNOOC_Case_Study.pdf
Document Type: Case Study |  Date Authored: 1 Dec 2016 |  Size: 245KB
Know how this upgrade helped The China National Offshore Oil Co. Ltd. (CNOOC) in improving operations through powerful functions backed by timely and detailed technical services.
www.honeywellprocess.com/library/marketing/case-studies/Case-Study-SEC-Migration.pdf
Document Type: Case Study |  Date Authored: 7 Dec 2015 |  Size: 213KB
Honeywell Migration Solutions Help Saudi Electricity Company Revitalize Control System and Address Cyber Threats.
1-10 of 60 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.