Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 

All Case Studies

1-10 of 10 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/MOL-Hungary-Case-Study.pdf
Document Type: Case Study |  Date Authored: 12 Feb 2020 |  Size: 2MB
At Hungary’s only crude oil refinery, a well-planned approach to control system and safety system migration extended the life of technology investments, expanded automation capabilities, and replaced legacy assets with a reliable and supportable system.Read the case study to know more.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-Froneri-PMDMigration.pdf
Document Type: Case Study |  Date Authored: 3 Sep 2018 |  Size: 1MB
Ice cream manufacturer Froneri used Honeywell’s migration tools and in-depth expertise to move to the latest control technology while making maximum use of its existing assets for an efficient, fast and smooth migration.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-TaiyoOil-DCSMigration.pdf
Document Type: Case Study |  Date Authored: 4 Oct 2017 |  Size: 1MB
Taiyo and Honeywell collaborated well to complete the DCS migration with no major issues and on schedule, with just a day of shutdown.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-Gunvor-Migration.pdf
Document Type: Case Study |  Date Authored: 21 Sep 2017 |  Size: 1MB
Gunvor Ingolstadt Refinery selected a HPM to EHPM On Process Migration to reduce risk and workload during refinery turnaround and focus on additional critical activities.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-KOGAS-SafetyManager.pdf
Document Type: Case Study |  Date Authored: 12 Apr 2017 |  Size: 1MB
Honeywell completed an FSC to Safety Manager Controller migration program at the KOGAS Tongyeong LNG re-gasification plant in Korea. Minimizing downtime, Honeywell delivered a solution that extends the life of the safety system while enhancing reliability and efficiency.
www.honeywellprocess.com/library/marketing/case-studies/Case-Study-SEC-Migration.pdf
Document Type: Case Study |  Date Authored: 7 Dec 2015 |  Size: 213KB
Honeywell Migration Solutions Help Saudi Electricity Company Revitalize Control System and Address Cyber Threats.
www.honeywellprocess.com/library/marketing/case-studies/Case study-Motiva-Migration.pdf
Document Type: Case Study |  Date Authored: 4 Nov 2015 |  Size: 97KB
Motiva Successfully Migrates from TDC 2000 to Experion® PKS
www.honeywellprocess.com/library/marketing/case-studies/case-study-QPNGL-on-process-migration.pdf
Document Type: Case Study |  Date Authored: 31 May 2015 |  Size: 247KB
The project included Station and Server hardware upgrades, software release migration to Experion R430, and existing CNI migration to the latest FTE technology. The greatest challenge was migrating CNI to FTE since no tool was available to migrate this technology On-Process.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-Total-ExperionUpgrade.pdf
Document Type: Case Study |  Date Authored: 22 Sep 2014 |  Size: 232KB
Total has been able to extend its existing automaton assets while upgrading legacy TDC 2000 control systems to Honeywell’s Experion® Process Knowledge System (PKS) technology.
www.honeywellprocess.com/library/marketing/case-studies/CS-Migration-Valero.pdf
Document Type: Case Study |  Date Authored: 30 Apr 2014 |  Size: 169KB
Valero’s Successful On-Process Migration: Experion® R310 to R410
1-10 of 10 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.