Case Studies

Case Studies

  • Add to My Bookmarks
  • SHARE 

All Case Studies

1-10 of 15 results
Sort by: 
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-TaiyoOil-DCSMigration.pdf
Document Type: Case Study |  Date Authored: 4 Oct 2017 |  Size: 1MB
Taiyo and Honeywell collaborated well to complete the DCS migration with no major issues and on schedule, with just a day of shutdown.
www.honeywellprocess.com/library/marketing/case-studies/Case-Study-SEC-Migration.pdf
Document Type: Case Study |  Date Authored: 7 Dec 2015 |  Size: 213KB
Honeywell Migration Solutions Help Saudi Electricity Company Revitalize Control System and Address Cyber Threats.
www.honeywellprocess.com/library/marketing/case-studies/Case study-Motiva-Migration.pdf
Document Type: Case Study |  Date Authored: 4 Nov 2015 |  Size: 97KB
Motiva Successfully Migrates from TDC 2000 to Experion® PKS
www.honeywellprocess.com/library/marketing/case-studies/case-study-on-Phillips-66-experion-ratio-controller.pdf
Document Type: Case Study |  Date Authored: 19 Oct 2015 |  Size: 97KB
Phillips 66 Alliance Refinery Upgrades to Experion® Ratio Controller (ERC).
www.honeywellprocess.com/library/marketing/case-studies/case-study-sappi-gratkorn-experion-upgrade.pdf
Document Type: Case Study |  Date Authored: 1 Jul 2015 |  Size: 476KB
Sappi completes an error-free, on schedule transition to newer technology migrating MXOpen QCS systems to Experion MX and the TP Alcont DCS to Experion PKS, fully integrated with Safety manager, PMD and PHD.
www.honeywellprocess.com/library/marketing/case-studies/CaseStudy-TronoxMines-SystemUpgrade.pdf
Document Type: Case Study |  Date Authored: 10 Jun 2015 |  Size: 224KB
Honeywell and Tronox worked together on a control system upgrade that addressed obsolescence issues associated with the R201 installed base and executed it in a manner that minimized the impact on Tronox operations.
www.honeywellprocess.com/library/marketing/case-studies/case-study-QPNGL-on-process-migration.pdf
Document Type: Case Study |  Date Authored: 31 May 2015 |  Size: 247KB
The project included Station and Server hardware upgrades, software release migration to Experion R430, and existing CNI migration to the latest FTE technology. The greatest challenge was migrating CNI to FTE since no tool was available to migrate this technology On-Process.
www.honeywellprocess.com/library/marketing/case-studies/CS-Migration-Valero.pdf
Document Type: Case Study |  Date Authored: 30 Apr 2014 |  Size: 169KB
Valero’s Successful On-Process Migration: Experion® R310 to R410
www.honeywellprocess.com/library/marketing/case-studies/CS-Migration-Marathon-Petroleum.pdf
Document Type: Case Study |  Date Authored: 29 Apr 2014 |  Size: 185KB
Marathon Petroleum’s Galveston Bay Division Embarks on Multi-Year Upgrade Path

Duplicates  (2)
www.honeywellprocess.com/library/marketing/case-studies/CS-HollyFrontier-Experion-Migration.pdf
Document Type: Case Study |  Date Authored: 11 Sep 2013 |  Size: 79KB
Preparation, Data Gathering and Site Support: Holly Refining & Marketing Company – Woods Cross LLC’s Migration To Experion R410.
1-10 of 15 results

Finding the information you need is important to us.

Did you find what you were looking for today?

  Yes      No

How likely are you to recommend HoneywellProcess.com to a colleague?

  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Not at all likely

Extremely likely

How can we serve you better?

Your email:

Your email address will help us get in touch with you to resolve your query/ concern.